Config

Dashboard settings. Kept in the app, never written to the tracker.

Utilization bands
applies everywhere

Utilization cut-offs, as a percentage. Drives every pod badge, heatmap cell and the high-bench flag.

Preview
The bands must increase: some bench, then healthy, then fully utilized.
Saves both cards, for everyone.
Capacity basis

These drive available hours, so utilization moves with them.

A contractor counts as a whole FT, not at the intern factor. Nothing records what they actually billed, so the dashboards can take them back out with Include contractors capacity.

Saves both cards, for everyone.
Pod Capacity (FT, Interns, Contractors)
Download
Amber = this month overridden, so TeamStructure will not change it. Clearing the current month re-derives it; clearing an earlier month deletes it.
Loading capacity...